Concrete casting and floor finishing

New Ways Trading and Contracting offers concrete placing, levelling and floor finishing for main contractors in Qatar and the Kingdom of Saudi Arabia, including slabs on grade and concrete toppings over hollow-core slabs, to the approved design.

Our focus is the concrete floor itself: placed to the specified levels and falls, surface regularity and finish. Readiness for the next trade, or for direct use, depends on the project's curing, strength, moisture and surface-condition requirements.

Scope we cover

  • Slab-on-grade placing and finishing
  • Raft foundations and suspended slabs, constructed to the approved structural design
  • Placing and finishing concrete toppings, including toppings over hollow-core slabs, to the approved structural design; reinforcement responsibilities are defined in the quotation
  • Power-floated and power-trowelled (helicopter) finishes
  • Saw-cut contraction joints to the approved joint layout
  • Concrete supply, pumping, placing and finishing responsibilities identified separately in our quotation

How we carry out concrete works

  1. Before placing, we confirm the agreed pour sequence, levels, access and joint layout, and that the main contractor has obtained the required formwork and reinforcement inspection approvals.
  2. Pumping, placing and compacting the concrete.
  3. Levelling with a laser screed machine where the pour arrangement permits, or with rotary laser level control.
  4. Power floating and trowelling with ride-on and mini trowels, as appropriate to the specified finish.
  5. Curing to the specification with a method compatible with the finishes that follow, and cutting contraction joints to the approved layout, depth and timing, before uncontrolled shrinkage cracking develops.
  6. Level and floor-flatness checks carried out jointly with the main contractor, using the specified test method and acceptance criteria, before handover.

Floor flatness and responsibilities

Tell us which acceptance method the contract uses: straightedge tolerances, ASTM E1155 F-numbers (FF/FL), TR34 or another method. These methods are not interchangeable, and specialist surveys are carried out by a third party where the contract requires it.

Our quotation sets out who is responsible for concrete supply, pumping, placing, formwork and reinforcement release, testing, curing, and joint layout and cutting. For toppings over hollow-core slabs, levels are coordinated with the survey and the plank camber, to the approved structural design.

Equipment and published projects

Our published equipment list includes a laser screed machine, concrete pumps, rotary laser equipment and ride-on trowels. See the full equipment list.

See our published Qatar projects for examples of New Ways concrete and screed scope, including Place Vendome Mall (main contractor CRC) and Lulu at Sailiyah (main contractor Shannon Engineering).

What we need to prepare a concrete quotation

  • Drawings with the pour areas, slab thicknesses and the concrete grade
  • The finish, and the flatness acceptance method (straightedge, FF/FL or TR34)
  • Who supplies the concrete
  • The joint layout, pour sizes and programme
  • The site access for pumps and laser screed equipment

 